What We Do

Services

Full breakdown of the deck work we take on, from framing to finish.

HomeServices

Everything we take on

Every job below is one we do ourselves across Lakeland.

Deck Installation

A new deck starts with footings dug below grade, sized for the load the frame will carry. We frame with pressure-treated joists on hot-dipped galvanized hangers and lay decking in pressure-treated pine, cedar, or composite. Ledger boards get flashed against the house before a single board goes down, that's the spot most decks fail first.

Deck Repair

Soft spots in decking, loose railings, and joists that have started to rot usually mean water's been getting in somewhere for a while. We pull the failed boards or framing, check what's underneath for termite damage, and rebuild that section to match. Sometimes a repair is a few boards, sometimes it's the whole substructure with new decking on top.

Deck Staining & Sealing

Florida sun breaks down wood fiber fast, and unsealed boards go gray and start splitting within a couple of seasons. We pressure wash first, let the wood dry fully, then apply a penetrating stain or clear sealer rated for UV and standing water. Composite decking doesn't need this, which is one reason people switch.

Custom Deck Design

Multi-level decks, built-in benches, pergolas over part of the deck, stairs that turn instead of running straight down, we lay it out to fit the yard instead of a stock rectangle. We'll walk the site with you and talk through what the framing underneath has to do to support what you want on top.

Composite Decking Installation

Composite boards don't rot, splinter, or need staining, and they hold up better than wood against Florida humidity. The framing underneath still has to be built right, hidden fastener systems and proper joist spacing matter more with composite because the boards behave differently than lumber in heat. We install Trex, TimberTech, and similar brands.

Deck Railing Repair & Installation

Wobbly railings and loose balusters are usually a sign the posts weren't bolted through the frame the first time around. Railings get rebuilt to current code height and baluster spacing, whether that's wood, aluminum, or cable rail. A railing that fails an inspection now can also fail under weight later, so post attachment isn't a place to cut corners.

Deck Resurfacing

If the framing underneath is still solid but the decking on top is cupped, splintering, or faded past saving, we strip the old boards and lay new decking on the existing structure. It's faster and cheaper than a full rebuild when the substructure checks out. Joists get inspected for rot before we commit to resurfacing over them.

Pool Deck Building

Pool decks take more splashing, standing water, and sun reflection than a regular backyard deck, so drainage and board gapping matter more here. Decking slopes slightly away from the pool edge, with fasteners and hardware rated for constant moisture. Composite or capped boards are usually the better call around a pool.

Screened-In Deck & Porch Additions

Turning a deck into a screened porch means adding a roof line and screen framing on top of a structure that has to carry that extra weight. The existing or new frame gets checked against that load before anything gets enclosed. It keeps the bugs out and gets more use out of the space during Florida rain.

Deck Demolition & Removal

Old decks come down before a rebuild, whether that's because the framing's rotted past saving or you just want a different footprint. Lumber and old hardware get hauled off, and the ledger area and siding behind it get checked for water damage before framing anything new.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Lakeland, FL

Deck installation and repair across Lakeland and the surrounding area.

Lakeland, FL
Kissimmee, FL
Winter Haven, FL
Plant City, FL
Haines City, FL
Auburndale, FL
Bartow, FL
Davenport, FL
Zephyrhills, FL
Lake Wales, FL
Mulberry, FL
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit for a new deck?
Most new deck builds attached to a house in Polk County need a building permit, especially if the deck sits above a certain height or ties into the home's structure. Permit pulling and inspection scheduling are handled as part of the project rather than left for the homeowner to sort out.
How long does a deck build usually take?
A straightforward single-level deck usually takes one to two weeks from the first day of framing to final boards, depending on size and weather. Multi-level decks, screened additions, or pool decks with more drainage work take longer, and permit and inspection timing adds days on either end.
Can you work within a set budget?
A budget can shape material choice, pressure-treated pine costs less than composite, and it can shape footprint or features like built-in seating or multiple levels. Saying the number up front lets the design get scaled to fit it instead of a quote coming back over budget.
What kind of warranty do you offer on a new deck?
Workmanship on framing and installation is covered for a set period after completion, and that gets spelled out in writing with the quote. Decking material itself usually carries its own manufacturer warranty separate from the installation warranty, composite brands especially.
Who will I be dealing with day to day during the build?
The same crew that measures and quotes the job is the crew doing the framing and decking, so questions during the build go to people who already know the site. There's no separate office layer between the estimate and the people actually cutting lumber.
What decking materials do you offer, and which holds up best in Florida?
Pressure-treated pine, cedar, and composite boards like Trex and TimberTech are all options, and composite generally holds up best against Florida humidity, sun, and pool splash without the yearly staining pine needs. Pine costs less up front but needs sealing on a schedule to avoid graying and splitting.
Can I still use my yard or pool while the deck is being built?
Most of the yard stays usable during a deck build, though the immediate work area has to stay clear for safety, especially around footing holes and framing. Pool access sometimes gets limited for a day or two during pool deck work while concrete or footings cure.
How do I need to prep the site before you start?
Clearing furniture, grills, and potted plants off the existing deck or the build area makes the first day faster, and moving anything fragile away from where lumber gets stacked helps too. Anything below or around the work area, sprinkler lines, irrigation, pet fencing, is worth pointing out before digging starts.
What happens if you find rot or termite damage once the old deck comes off?
Hidden rot or termite damage in ledger boards, siding, or framing behind an old deck gets flagged before new construction goes on top of it, since building over damaged wood just hides the problem. Any extra repair required gets priced separately and discussed before work continues.
How do I take care of my deck after it's built to keep it from failing early?
Pressure-treated and cedar decking need cleaning and resealing every year or two in Florida sun, while composite mainly needs regular washing to keep algae and pollen from building up. Checking railings and fasteners for looseness once a year catches small problems before they turn into rot or a safety issue.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (863) 264-0363